dc.contributor.advisor | Timohty G. Gutowski. | en_US |
dc.contributor.author | Neo, Ein-Teck | en_US |
dc.date.accessioned | 2005-08-17T23:23:49Z | |
dc.date.available | 2005-08-17T23:23:49Z | |
dc.date.copyright | 1995 | en_US |
dc.date.issued | 1995 | en_US |
dc.identifier.uri | http://hdl.handle.net/1721.1/11100 | |
dc.description | Thesis (Ph. D.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1995. | en_US |
dc.description | Includes bibliographical references (p. 149-153). | en_US |
dc.description.statementofresponsibility | by Ein Teck Neoh. | en_US |
dc.format.extent | 453 p. | en_US |
dc.format.extent | 31507661 bytes | |
dc.format.extent | 31507418 bytes | |
dc.format.mimetype | application/pdf | |
dc.format.mimetype | application/pdf | |
dc.language.iso | eng | en_US |
dc.publisher | Massachusetts Institute of Technology | en_US |
dc.rights | M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. | en_US |
dc.rights.uri | http://dspace.mit.edu/handle/1721.1/7582 | |
dc.subject | Mechanical Engineering | en_US |
dc.title | Adaptive framework for estimating fabrication time | en_US |
dc.type | Thesis | en_US |
dc.description.degree | Ph.D. | en_US |
dc.contributor.department | Massachusetts Institute of Technology. Department of Mechanical Engineering | |
dc.identifier.oclc | 34098689 | en_US |