Show simple item record

dc.contributor.advisorTimohty G. Gutowski.en_US
dc.contributor.authorNeo, Ein-Tecken_US
dc.date.accessioned2005-08-17T23:23:49Z
dc.date.available2005-08-17T23:23:49Z
dc.date.copyright1995en_US
dc.date.issued1995en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/11100
dc.descriptionThesis (Ph. D.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1995.en_US
dc.descriptionIncludes bibliographical references (p. 149-153).en_US
dc.description.statementofresponsibilityby Ein Teck Neoh.en_US
dc.format.extent453 p.en_US
dc.format.extent31507661 bytes
dc.format.extent31507418 bytes
dc.format.mimetypeapplication/pdf
dc.format.mimetypeapplication/pdf
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582
dc.subjectMechanical Engineeringen_US
dc.titleAdaptive framework for estimating fabrication timeen_US
dc.typeThesisen_US
dc.description.degreePh.D.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineering
dc.identifier.oclc34098689en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record