Walton, Myles Alexander, 1975- (Massachusetts Institute of Technology, 1999)
Requirements generation is an influential time in the evolution of the program. It allocates 70% of the life-cycle cost of a program and is responsible for a large percentage of the system errors and cost overruns. This ...