Head & base production optimization : setup time reduction
Name
611148027-MIT.pdf
Description
Full printable version
Size
5.67 MB
Format
Adobe PDF
Checksum (MD5)
1c6e95d38aedb02f4fd04a5af2b0b110
Author(s)
Guo, Haiqing
Advisor(s)
Kamal Youcef-Toumi.
Alternative Title
Head and base production optimization : setup time reduction
Date Issued
2009
Publisher
Massachusetts Institute of Technology
Abstract
At Schlumberger, the make-to-order strategy and number of Head & Base product types (about 1000 types) requires a flexible manufacturing system in which the machine setup is frequent. However, the lengthy CNC machine setup time in the Head & Base machining station directly affects the manufacturing capacity. This research implements Single Minute Exchange of Die (SMED) methodology and proposes a set of solutions, such as manufacturing sequence optimization, setup sequence optimization, setup operation simplification, etc, to reduce setup time without sacrificing quality. Most of the solutions have been implemented and the result is significant and impressive, the overall setup time has been reduced by up to 40 percent and the expected cost saving is about 50,000 USD.
Description
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2009.
Cataloged from PDF version of thesis.
Includes bibliographical references (p. 53).
Subjects
Mechanical Engineering.
MIT Department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Terms of Use
M.I.T. theses are protected by
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
Persistent DSpace Link