An application of Value Stream Mapping to reduce lead time and WIP in a make-to-order manufacturing line
Name
712601681-MIT.pdf
Description
Full printable version
Size
12.27 MB
Format
Adobe PDF
Checksum (MD5)
7dcb4602ea63f0a69ca38ce71d9ae670
Author(s)
Wongso, Ricolas
Advisor(s)
Stephen C. Graves.
Alternative Title
Application of VSM to reduce lead time and Work In Process in a make-to-order manufacturing line
Date Issued
2010
Publisher
Massachusetts Institute of Technology
Abstract
Significant growth in the sales is expected in the coming years for the product family that is the focus of this research. In order to meet the takt time for the future demand, improvement on the current processes and expansion are needed. In this work, Value Stream Mapping was implemented to identify the bottleneck processes: fit up (oval), full welding, and pressure testing. Assembly cell concept, workload balancing and FIFO lanes were proposed countermeasures or improvements to address the capacity shortfall. A decrease of 27% in manufacturing lead time was projected if these improvements were made. In addition, the capacity analysis suggests that an expansion is required in full welding and heat treatment furnace.
Description
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.
Cataloged from PDF version of thesis.
Includes bibliographical references (p. 57).
Subjects
Mechanical Engineering.
MIT Department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Terms of Use
M.I.T. theses are protected by
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
Persistent DSpace Link