Login

Cambridge Grand Junction transit implementation : alternatives, scheduling, cost, and performance

Show full item record




Title: Cambridge Grand Junction transit implementation : alternatives, scheduling, cost, and performance
Author: Iglesias Cuervo, Jesus
Other Contributors: Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering.
Advisor: John Attanucci.
Department: Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering.
Publisher: Massachusetts Institute of Technology
Issue Date: 2012
Abstract: The Grand Junction railroad lies at the heart of East Cambridge adjacent to the Kendall Square business district and the Massachusetts Institute of Technology campus. Over the last one hundred years the railroad has gone through substantial changes - from an important freight corridor to having just a few train movements per day. The recent purchase of the railroad by the Commonwealth of Massachusetts, planned relocations of existing freight yards, and future corridor improvements have made it possible to consider the addition of passenger services on the Grand Junction. Rising employment, population, and the congestion of the existing commuter rail facilities necessitate exploration of existing means to alleviate capacity. This study is part of larger study that explores the addition of passenger transit services on the Grand Junction with the goal of increasing frequency and capacity to the west along the Worcester/Framingham main line. The topics of this paper are service alternatives, scheduling, cost and performance. The study outlines all possible alternatives that are then screened for final analysis. Commuter rail and diesel multiple unit (DMU) services are the alternatives quantitatively analyzed. A schedule model estimates the maximum frequency, based on existing constraints, to be five trains per hour. Marginal cost modeling shows that based on estimated demand levels, DMU trains may be a more financially viable option for Grand Junction service. This conclusion is backed up by performance comparison of DMUs and commuter trains, showing that DMUs in the configurations proposed are quieter, more fuel efficient, and would likely have a smaller traffic impact along the densely populated Grand Junction corridor. A substantial and detailed study of DMU service along the Grand Junction is recommended.
Description: Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2012.Cataloged from PDF version of thesis.Includes bibliographical references (p. 77).
URI: http://hdl.handle.net/1721.1/73788
Keywords: Civil and Environmental Engineering.

Files in this item

Files Size Format View Description
Preview, non-printable (open to all) 18.81Mb PDF View/Open Preview, non-printable (open to all)
Full printable version (MIT only) 18.81Mb PDF View/Open Full printable version (MIT only)

This item appears in the following Collection(s)

Show full item record

Search DSpace@MIT


Advanced Search

Browse

My Account

Links