Login

Optimal Methodology for Synchronized Scheduling of Parallel Station Assembly with Air Transportation

Show full item record




Title: Optimal Methodology for Synchronized Scheduling of Parallel Station Assembly with Air Transportation
Author: Ganesan, Viswanath Kumar; Li, Kungpeng; Appa Iyer, Sivakumar
Issue Date: 2005-01
Abstract: We present an optimal methodology for synchronized scheduling of production assembly with air transportation to achieve accurate delivery with minimized cost in consumer electronics supply chain (CESC). This problem was motivated by a major PC manufacturer in consumer electronics industry, where it is required to schedule the delivery requirements to meet the customer needs in different parts of South East Asia. The overall problem is decomposed into two sub-problems which consist of an air transportation allocation problem and an assembly scheduling problem. The air transportation allocation problem is formulated as a Linear Programming Problem with earliness tardiness penalties for job orders. For the assembly scheduling problem, it is basically required to sequence the job orders on the assembly stations to minimize their waiting times before they are shipped by flights to their destinations. Hence the second sub-problem is modelled as a scheduling problem with earliness penalties. The earliness penalties are assumed to be independent of the job orders.
URI: http://hdl.handle.net/1721.1/7458
Series/Report no.: Innovation in Manufacturing Systems and Technology (IMST);
Keywords: Scheduling, Supply chain, Optimization, air transportation

Files in this item

Files Size Format View
IMST019.pdf 365.5Kb PDF View/Open

This item appears in the following Collection(s)

Show full item record

Search DSpace@MIT


Advanced Search

Browse

My Account

Links