System dynamic models for construction projects
Name
42673144-MIT.pdf
Description
Full printable version
Size
9.51 MB
Format
Adobe PDF
Checksum (MD5)
89f5a5dbd19441ae0a87794e21edda93
Author(s)
Kwok, Sze Yiu Gordon, 1974-
Advisor(s)
Feniosky Peña-Mora.
Date Issued
1999
Publisher
Massachusetts Institute of Technology
Abstract
This thesis studies the application of system dynamics principles and models to construction project negotiations and schedule. It helps improve the efficiency of the negotiation processes and allows planners to realize the shortcomings of their proposed schedules through showing the relationships and interactions between variables in the processes or the schedules. This research is conducted as an effort to demonstrate the usefulness of the system dynamics models on the construction industry. By developing robust system dynamics models, the efficiencies and the overall performances of the construction projects could be improved as the probability of project delay would be significantly reduced through, much better planning and more efficient negotiation process.
Description
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1999.
Includes bibliographical references (leaves 111-113).
Subjects
Civil and Environmental Engineering
MIT Department
Massachusetts Institute of Technology. Department of Civil and Environmental Engineering
Terms of Use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Persistent DSpace Link