Multiple-part-type systems in high volume manufacturing : Kanban System design for automatic production scheduling
Name
399592922-MIT.pdf
Description
Full printable version
Size
63.82 MB
Format
Adobe PDF
Checksum (MD5)
d74bd20cc493b801ae01584a9bad374d
Author(s)
Lee, Kaizhao
Advisor(s)
Stanley B. Gershwin.
Alternative Title
Kanban System design for automatic production scheduling
Date Issued
2008
Publisher
Massachusetts Institute of Technology
Abstract
A Kanban Production System is designed to help a factory line meet fluctuating demands for multiple part types. Based on the parameter settings of the Control-Point Policy, the optimum Kanban levels are obtained. The simulation software Simul8 was used to model the factory line and the Kanban system. Using the optimum Kanban levels, the Kanban system will act as an automatic production scheduling system that will indicate clearly when and how much of each part-type should be produced. Use of this system will avoid unnecessary inventory and changeover cost incurred by the existing Kanban system used by the factory line. Key words: Kanban, Control-Point Policy, Optimization Disclaimer: The content of the thesis is modified to protect the real identity of the attachment company. Company name and confidential information are omitted.
Description
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008.
Includes bibliographical references (leaf 71).
Subjects
Mechanical Engineering.
MIT Department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Terms of Use
M.I.T. theses are protected by
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
Persistent DSpace Link