Implementing critical chain to improve product development performance
Name
57554515-MIT.pdf
Description
Full printable version
Size
11.18 MB
Format
Adobe PDF
Checksum (MD5)
73063c59a556e8cfd2de9b0b5b49cd3f
Author(s)
Weisheit, James E., 1971-
Advisor(s)
Thomas Roemer.
Date Issued
2004
Publisher
Massachusetts Institute of Technology
Abstract
Project management is a crucial aspect of product development. There is a need for better project management tools to help product development teams meet their schedule, budget, and technical requirements more accurately with the given uncertainty of each product development project. This thesis is a case study of a Critical Chain implementation. The implementation included the creation of project networks and Critical Chain schedules for each development project studied in this thesis. Once the schedules were in place, the teams developed the products following Critical Chain Project Management (CCPM). The theory behind CCPM has merit but the culture change necessary to achieve a competitive was found challenging in practice. In this thesis, the author studied CCPM from two perspectives: project management and resource management. The team demonstrated both perspectives to an extent, but four months was not enough time. CCPM appeared to improve performance of each project, but the resource management goals of the thesis were not as successful.
Description
Thesis (S.M.)--Massachusetts Institute of Technology, System Design & Management Program, 2004.
Includes bibliographical references (p. 81).
Subjects
System Design and Management Program.
MIT Department
System Design and Management Program.
Terms of Use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Persistent DSpace Link