Repository logo
Log in(current)
Repository logoMIT Open ScholarshipDSpace@MIT
  1. Home
  2. MIT Open Access Articles
  3. MIT Open Access Articles
  4. Boosting Event Building Performance using Infiniband FDR for the CMS Upgrade

Boosting Event Building Performance using Infiniband FDR for the CMS Upgrade

Thumbnail Image
Download
Name

TIPP2014_190.pdf

Description
Published version
Size

1.07 MB

Format

Adobe PDF

Checksum (MD5)

134559112afcf73e0f54add036c53019

sword-2019-04-29T19:36:24.original.xml (130 B)
Original SWORD entry document
Author(s)
FORREST, Andrew Kevin
•
Bawej, Tomasz
•
Branson, James
•
Behrens, Ulf
•
Chaze, Olivier
•
Cittolin, Sergio
•
Darlea, Georgiana-Lavinia
•
Deldicque, Christian
•
Dobson, M.
•
Dupont, Aymeric
more
Date Issued
July 3, 2015
Publisher
Sissa Medialab
Citation
FORREST, Andrew Kevin, Bawej, Tomasz, Branson, James, Behrens, Ulf, Chaze, Olivier et al. 2015. "Boosting Event Building Performance using Infiniband FDR for the CMS Upgrade."
Version
Final published version
Abstract
© Copyright owned by the author(s) under the terms of the Creative Commons Attribution-NonCommercial-ShareAlike Licence. As part of the CMS upgrade during CERN's shutdown period (LS1), the CMS data acquisition system is incorporating Infiniband FDR technology to boost event-building performance for operation from 2015 onwards. Infiniband promises to provide substantial increase in data transmission speeds compared to the older 1GE network used during the 2009-2013 LHC run. Several options exist to end user developers when choosing a foundation for software upgrades, including the uDAPL (DAT Collaborative) and Infiniband verbs libraries (OFED). Due to advances in technology, the CMS data acquisition system will be able to achieve the required throughput of 100 kHz with increased event sizes while downsizing the number of nodes by using a combination of 10GE, 40GE and 56 Gb Infiniband FDR. This paper presents the analysis and results of a comparison between GE and Infiniband solutions as well as a look at how they integrate into an event building architecture, while preserving the scalability, efficiency and deterministic latency expected in a high end data acquisition network.
MIT Department
Massachusetts Institute of Technology. Laboratory for Nuclear Science
Massachusetts Institute of Technology. Department of Physics
Terms of Use
Creative Commons Attribution-Noncommercial-Share Alike
http://creativecommons.org/licenses/by-nc-sa/4.0/
Persistent DSpace Link
https://hdl.handle.net/1721.1/137034
DOI of Published Version
https://doi.org/10.22323/1.213.0190
Repository logo
PrivacyPermissionsAccessibilityContact us
Repository logo
Notify us about copyright concerns.