Warner Robins and the Buy Purchase Request Process
Name
0412_Cohen_WarnerRobinsBuyPurchase.pdf
Size
176.02 KB
Format
Adobe PDF
Checksum (MD5)
464db120550e0a3f82158c7f9ae4f659
Author(s)
Cohen, Jessica Lauren
Date Issued
December 2004
Abstract
Throughout the United States Air Force, Warner Robins Air Logistics Center (ALC) has a reputation of being ahead of the game when it comes to lean implementation. Efforts on the shop floor have contributed vastly to that reputation. In addition, administrative accomplishments need to be recognized as a significant contribution to the lean effort at Warner Robins. At the Warner Robins Air Logistics Center (ALC), the ultimate goal of every employee is to serve the warfighter effectively and efficiently through the maintenance and repair of aircraft. The ALC’s main work is in Program Depot Maintenance (PDM) which supports aircraft sustainment operations for seven Product Directorates. Within Product Directorates are the System Program Offices (SPOs), such as C-5 or C-130, of Air Force weapon systems. Sustainment is a dauntingly complex process for the Air Force involving the Depot and PDM efforts, movement and storage of parts, and the base repair process. In 2002, Warner Robins embarked upon a lean journey to improve the reliability, timeliness and costs associated with its repair operations. Within the context of that improvement attempt, this case study examines the efforts to maximize purchase request efficiency, (i.e., shorten the time needed to acquire parts).
Subjects
Warner Robins Air Logistics Center
ALC
program depot maintenance
PDM
lean purchase request
lean implementation
Terms of Use
Attribution-NonCommercial-ShareAlike 3.0 United States
Persistent DSpace Link