Repository logo
Log in(current)
Repository logoMIT Open ScholarshipDSpace@MIT
  1. Home
  2. MIT Libraries
  3. MIT Theses
  4. Graduate Theses
  5. Construction management : preliminary cost estimate and scheduling of MIT's Civil and Environmental Engineering building

Construction management : preliminary cost estimate and scheduling of MIT's Civil and Environmental Engineering building

Thumbnail Image
Download
Name

43695578-MIT.pdf

Description
Full printable version
Size

4.13 MB

Format

Adobe PDF

Checksum (MD5)

d68683f42d88baf4e0ba309c2ca321b7

Author(s)
Deshpande, Pushkar V. (Pushkar Vijaykumar), 1977-
Advisor(s)
Jerome J. Connor, Jr.
Date Issued
1999
Publisher
Massachusetts Institute of Technology
Description
Thesis (M.Eng.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1999.
Includes bibliographical references (leaf 43).
Subjects
Civil and Environmental Engineering.
MIT Department
Massachusetts Institute of Technology. Department of Civil and Environmental Engineering
Terms of Use
M.I.T. theses are protected by
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
http://dspace.mit.edu/handle/1721.1/7582
Persistent DSpace Link
http://hdl.handle.net/1721.1/80582
Repository logo
PrivacyPermissionsAccessibilityContact us
Repository logo
Notify us about copyright concerns.