Foundation settlements of English cathedrals
Name
1003324494-MIT.pdf
Description
Full printable version
Size
24.34 MB
Format
Adobe PDF
Checksum (MD5)
5277d34b7620eb3dc86006642ece1186
Author(s)
Temco, Zoe (Zoe Robin)
Advisor(s)
John Ochsendorf and Herbert Einstein.
Date Issued
2017
Publisher
Massachusetts Institute of Technology
Abstract
In this thesis, the structural and geotechnical components that contribute to the settlement of English cathedrals are analyzed. The stress at the base of tower and nave piers was found and compared to the allowable bearing capacity. The expected settlement range of each cathedral's tower and nave piers was calculated by analyzing the site's soil conditions. The average settlement expected for a central tower pier not founded on bedrock is between 14 and 21 cm, which is greater than the average expected settlement of a nave pier, 7cm. An average differential settlement between the nave and tower piers expected is between 7 and 14 cm, which can contribute to cracking in the masonry or even structural failures. Less differential settlement will occur in areas with firmer soil than with deep clay.
Description
Thesis: M. Eng., Massachusetts Institute of Technology, Department of Civil and Environmental Engineering, 2017.
Cataloged from PDF version of thesis.
Includes bibliographical references (pages 83-87).
Subjects
Civil and Environmental Engineering.
MIT Department
Massachusetts Institute of Technology. Department of Civil and Environmental Engineering
Terms of Use
MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission.
Persistent DSpace Link