The FIRE infrared spectrometer at Magellan: construction and commissioning
Name
Schechter_The Fire.pdf
Size
5.81 MB
Format
Adobe PDF
Checksum (MD5)
4650f6d66bc6b78b3c51e7d1a0671a71
Author(s) • • • • • • • • •
Simcoe, Robert A.
Burgasser, Adam J.
Bochanski, John J.
Schechter, Paul L.
Bernstein, Rebecca A.
Bigelow, Bruce C.
Pipher, Judith L.
Forrest, William
McMurtry, Craig
Smith, Matthew J.
Date Issued
July 2010
Journal
Proceedings of SPIE--the International Society for Optical Engineering; v.7735
Publisher
SPIE
Citation
Simcoe, Robert A. et al. “The FIRE Infrared Spectrometer at Magellan: Construction and Commissioning.” Proceedings of SPIE--the International Society for Optical Engineering; v.7735 (2010): 773514–773514–12. © SPIE 2010
Version
Final published version
Abstract
We describe the construction and commissioning of FIRE, a new 0.8-2.5μm echelle spectrometer for the Magellan/ Baade 6.5 meter telescope. FIRE delivers continuous spectra over its full bandpass with nominal spectral resolution R = 6000. Additionally it offers a longslit mode dispersed by the prisms alone, covering the full z to K bands at R ~ 350. FIRE was installed at Magellan in March 2010 and is now performing shared-risk science observations. It is delivering sharp image quality and its throughput is sufficient to allow early observations of high redshift quasars and faint brown dwarfs. This paper outlines several of the new or unique design choices we employed in FIRE's construction, as well as early returns from its on-sky performance.
MIT Department
Massachusetts Institute of Technology. Department of Physics
Terms of Use
Article is made available in accordance with the publisher's policy and may be subject to US copyright law. Please refer to the publisher's site for terms of use.
Persistent DSpace Link
DOI of Published Version
https://doi.org/10.1117/12.856088