Repository logo
Log in(current)
Repository logoMIT Open ScholarshipDSpace@MIT
  1. Home
  2. MIT Libraries
  3. MIT Theses
  4. Graduate Theses
  5. Risk management in toll road concessions

Risk management in toll road concessions

Thumbnail Image
Download
Name

52200546-MIT.pdf

Description
Full printable version
Size

4.68 MB

Format

Adobe PDF

Checksum (MD5)

ad3d82911fa3604ef9617064177c594f

Author(s)
El-Amm, Lara A. (Lara Alexandre), 1979-
Advisor(s)
Fred Moavenzadeh.
Date Issued
2003
Publisher
Massachusetts Institute of Technology
Abstract
With a degrading road infrastructure and dwindling public funds, governments are turning towards the private sector to develop roads and finance them though toll revenues. However, these high stakes endeavors were not always successful; in other words, they were not able to provide a fair return to the sponsors and investors while guaranteeing the public welfare and satisfying the government interests. A review of the international experience of toll roads, with a focus on developing countries, suggests that if a thorough and pertinent risk management program is implemented by private concessionaires, with the support of the government, then many risks could be mitigated, thus reducing the exposure of both the private sponsor and the government. Thus, in this study, we suggest a three-step risk management process. This first step of this process consists of identifying and classifying the risks in toll roads, according to the milieu from which they stem (project, market, country); the second step is an investigation in an array of risk mitigation strategies that are relevant to one or more risk categories; finally, the third step is risk analysis which consists of accounting for risks when evaluating a project. In the last two chapters, we will embody major issues in risk management in two case studies: In the first case study, New Batinah Highway project, we focus on the value of flexibility in toll roads and in the second case study, Melbourne City Link project, we focus mainly on the role of project organization and financial structure in risk management. Finally, in the conclusion, we emphasize that the private sponsor cannot be the only player in the risk management process but government support and commitment are vital. Thus we redefine the role of the government and the role of the private concessionaire in the provision of toll roads.
Description
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2003.
Includes bibliographical references (leaves 82-84).
Subjects
Civil and Environmental Engineering.
MIT Department
Massachusetts Institute of Technology. Department of Civil and Environmental Engineering
Terms of Use
M.I.T. theses are protected by
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
http://dspace.mit.edu/handle/1721.1/7582
Persistent DSpace Link
http://hdl.handle.net/1721.1/47918
Repository logo
PrivacyPermissionsAccessibilityContact us
Repository logo
Notify us about copyright concerns.