Impact of unit commitment constraints on generation expansion planning with renewables
Name
Webster_Impact of.pdf
Size
382.94 KB
Format
Adobe PDF
Checksum (MD5)
f1450f928f06f31be17ba268ff12c7b7
Author(s) •
Palmintier, Bryan Stephen
Webster, Mort David
Date Issued
July 2011
Journal
Proceedings of the 2011 IEEE Power & Energy Society General Meeting
Publisher
Institute of Electrical and Electronics Engineers
Citation
Palmintier, Bryan, and Mort Webster. “Impact of Unit Commitment Constraints on Generation Expansion Planning with Renewables.” IEEE, 2011. 1–7. Web.
Version
Author's final manuscript
Abstract
Growing use of renewables pushes thermal generators against operating constraints - e.g. ramping, minimum output, and operating reserves - that are traditionally ignored in expansion planning models. We show how including such unit-commitment-derived details can significantly change energy production and optimal capacity mix. We introduce a method for efficiently combining unit commitment and generation expansion planning into a single mixed-integer optimization model. Our formulation groups generators into categories allowing integer commitment states from zero to the installed capacity. This formulation scales well, runs much faster (e.g. 5000×) than individual plant binary decisions, and makes the combined model computationally tractable for large systems (hundreds of generators) at hourly time resolutions (8760 hours) using modern solvers on a personal computer. We show that ignoring these constraints during planning can result in a sub-optimal capacity mix with significantly higher operating costs (17%) and carbon emissions (39%) and/or the inability to meet emissions targets.
MIT Department
Massachusetts Institute of Technology. Engineering Systems Division
Terms of Use
Creative Commons Attribution-Noncommercial-Share Alike 3.0
Persistent DSpace Link
DOI of Published Version
https://doi.org/10.1109/PES.2011.6038963