Strategic and operational plan for better material handling
Name
418043607-MIT.pdf
Description
Full printable version
Size
17.15 MB
Format
Adobe PDF
Checksum (MD5)
1df22e50d0457a579dcbe84e9afbe458
Author(s)
Zhao, Changhui
Advisor(s)
Stephen C. Graves.
Date Issued
2008
Publisher
Massachusetts Institute of Technology
Abstract
Currently the material handling in NPC Singapore is done manually via forklift trucks. As the production volume increases and a new product launches, the current capacity will not be sufficient for 2012. In order to avoid the production loss and increase the operational efficiency, four solutions have been tested, including forklift trucks and labor extension, Kanban redesign in staging areas, conveyor implementation in staging areas and automating the transportation between the warehouse and production via implementing AGVs or transfer cars. In this thesis research we specifically analyze the use of AGVs and transfer cars. By implementing two transfer cars in 2012, the system capacity will remain adequate until 2018. This investment provides a $364,165 net present value and a 29% internal rate of return.
Description
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008.
Includes bibliographical references (leaf 65).
Subjects
Mechanical Engineering.
MIT Department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Terms of Use
M.I.T. theses are protected by
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
Persistent DSpace Link