Estimation of ship construction costs
Name
77500634-MIT.pdf
Description
Full printable version
Size
10.17 MB
Format
Adobe PDF
Checksum (MD5)
aae5bcd26ef033d7be5cf3d7ec0132cd
Author(s)
Miroyannis, Aristides
Advisor(s)
Henry S. Marcus.
Date Issued
2006
Publisher
Massachusetts Institute of Technology
Abstract
Since the end of the Cold War naval procurement for the US Navy has seen a dramatic decrease. This decrease in defense spending has placed existing programs under more scrutiny than previous years. As a result there is less tolerance on the part of taxpayers and Congress for procurement cost growth. This Thesis attempts to examine the current method that the Navy conducts ship cost estimates and suggests changes in order to improve the confidence level and accuracy of the forecasts. An examination of how industry is conducting cost estimates was used as a comparison to the current Navy practices. Finally using only a weight based approach to ship cost estimating is insufficient. It is necessary to develop and use a model that incorporates other cost driving factors in order to develop estimates of sufficient quality at the preliminary design level.
Description
Thesis (S.M. in Ocean Systems Management)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2006.
Includes bibliographical references (p. 105-107).
Subjects
Mechanical Engineering.
MIT Department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Terms of Use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Persistent DSpace Link