Material planning and inventory management
Name
399638869-MIT.pdf
Description
Full printable version
Size
10.09 MB
Format
Adobe PDF
Checksum (MD5)
3415e441b9c9b0b9265f4f4bd66b02bd
Author(s)
Han, Dafei
Advisor(s)
Stanley B. Gershwin.
Date Issued
2008
Publisher
Massachusetts Institute of Technology
Abstract
The management of raw material at Blue Brick in Singapore is costly as the company is forced to pay for external storage when the ports' time allowance runs out. A new ordering policy of (Q, R) continuous review model with forecast demand is developed to reduce inventory in the external warehouse. The policy parameters of four most commonly used paperboards are determined and simulations based on historical demand data are run to evaluate the policy. A simulation with Crystal Ball is also run to prove the efficacy of the (Q, R) method. Both the theoretical and simulation results suggest that the new ordering policy satisfies the stock-out requirement and ports' inventory day requirement. Thus Blue Brick can eliminate the four common paperboards' inventory in the external warehouse. Moreover if the forecast errors of other paperboards have the same levels as the ones of the four common paperboards, Blue Brick could eliminate all the inventories in the external warehouse.
Description
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008.
Includes bibliographical references (leaf 43).
Subjects
Mechanical Engineering.
MIT Department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Terms of Use
M.I.T. theses are protected by
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
Persistent DSpace Link