Inventory and flowtime reduction through integrating an aerospace manufacturing system
Name
29550740-MIT.pdf
Description
Full printable version
Size
10.21 MB
Format
Adobe PDF
Checksum (MD5)
185913953bcf025069f0f36fc4bb5690
Author(s)
Lundstrom, Mark E. (Mark Emil)
Advisor(s)
Joseph Shea.
Date Issued
1993
Publisher
Massachusetts Institute of Technology
Description
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Aeronautics and Astronautics, 1993, and Thesis (M.S.)--Massachusetts Institute of Technology, Sloan School of Management, 1993.
Includes bibliographical references (p. 149).
Subjects
Aeronautics and Astronautics
Sloan School of Management
MIT Department
Sloan School of Management
Massachusetts Institute of Technology. Department of Aeronautics and Astronautics
Terms of Use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Persistent DSpace Link