Cost and U.S. public policy for new coal power plants with carbon capture and sequestration
Name
Hamilton-2009-Cost and U.S. public.pdf
Size
342.17 KB
Format
Adobe PDF
Checksum (MD5)
78acc3d35036a43970020ead3aaf2303
Author(s) • •
Hamilton, Michael R.
Herzog, Howard J.
Parsons, John E
Date Issued
February 2009
Journal
Energy Procedia
Publisher
Elsevier
Citation
Hamilton, Michael R., Howard J. Herzog, and John E. Parsons. “Cost and U.S. Public Policy for New Coal Power Plants with Carbon Capture and Sequestration.” Energy Procedia 1, no. 1 (February 2009): 4487–4494.
Version
Final published version
Abstract
This paper provides a financial analysis for new supercritical pulverized coal plants with carbon capture and sequestration (CCS) that compares the effects of two relevant climate policies. First, an updated cost estimate is presented for new supercritical pulverized coal plants, both with and without CCS. The capital cost escalation of recent years can be attributed to rising materials, plant supply, and plant contractor constraints. This estimate is then compared with recent estimates from public sources. Second, several current and proposed public policies relevant to CCS are presented. Finally, a financial analysis is performed to evaluate the effectiveness of two likely US carbon regulations on deploying Nth-plant CCS technology. The major conclusion is that the leading US carbon cap-and-trade bills will likely not be sufficient to deploy CCS technology in a manner consistent with a 550 ppm CO[subscript 2] stabilization scenario. A more aggressive carbon policy including CCS research, development, and demonstration must be considered to achieve this goal with significant CCS deployment.
MIT Department
Massachusetts Institute of Technology. Department of Economics
MIT Energy Initiative
Sloan School of Management
Terms of Use
Creative Commons Attribution
Persistent DSpace Link
DOI of Published Version
https://doi.org/10.1016/j.egypro.2009.02.266