Multiple-part-type production scheduling for high volume manufacturing (time-based approach)
Name
417851195-MIT.pdf
Description
Full printable version
Size
26.18 MB
Format
Adobe PDF
Checksum (MD5)
e4c2bfc6898e83b49f718211ca821c07
Author(s)
Xie, Zhiyu, M. Eng. Massachusetts Institute of Technology
Advisor(s)
Stanley B. Gershwin.
Date Issued
2008
Publisher
Massachusetts Institute of Technology
Abstract
An effective production scheduling strategy would lead to efficient production line performance as well as increased profit. However, there is no fixed or generalized solution. In this thesis, Nonlinear Programming and time-based Control Point Policy were applied in sequence to solve the production scheduling problems at a high volume industry. The strategy provided the company a systematic way to tackle production problems. A distinct tradeoff between average inventory and frequency of changeover is observed. A recommended selection is made based on minimizing total cost (inventory holding cost and changeover cost). Comparing with current line behavior, the recommended selection will reduce the total cost by more than half.
Description
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008.
Includes bibliographical references (leaf 44).
Subjects
Mechanical Engineering.
MIT Department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Terms of Use
M.I.T. theses are protected by
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
Persistent DSpace Link