Renewable Energy Potential Estimation Using Climatic-Weather-Forecasting Machine Learning Algorithms
Name
energies-16-01603-v2.pdf
Size
25.21 MB
Format
Adobe PDF
Checksum (MD5)
6cd9773d49fef0277448bd9c18c95915
Author(s) • • • • • • • •
Maduabuchi, Chika
Nsude, Chinedu
Eneh, Chibuoke
Eke, Emmanuel
Okoli, Kingsley
Okpara, Emmanuel
Idogho, Christian
Waya, Bryan
Harsito, Catur
Date Issued
February 5, 2023
Publisher
Multidisciplinary Digital Publishing Institute
Citation
Energies 16 (4): 1603 (2023)
Version
Final published version
Abstract
The major challenge facing renewable energy systems in Nigeria is the lack of appropriate, affordable, and available meteorological stations that can accurately provide present and future trends in weather data and solar PV performance. It is crucial to find a solution to this because information on present and future solar PV performance is important to renewable energy investors so that they can assess the potential of renewable energy systems in various locations across the country. Although Nigerian weather provides favorable weather conditions for clean power generation, there is little penetration of renewable energy systems in the region, since over 95% of the power is fossil-fuel-generated. This is because there has been no detailed report showing the potential of clean power generation systems due to the dysfunctional meteorological stations in the country. This paper sought to fill this knowledge gap by providing a machine-learning-inspired forecasting of environmental weather parameters that can be used by manufacturing companies in evaluating the profitability of siting renewable energy systems in the region. Crucial weather parameters such as daily air temperature, relative humidity, atmospheric pressure, wind speed, and rainfall were obtained from NASA for a period of 19 years (viz. 2004–2022), resulting in the collection of 6664 high-resolution data points. These data were used to build diverse regressive neural networks with varying hyperparameters to find the best network arrangement. In summary, a low mean-squared error of 7 × 10−3 and high regression correlations of 96% were obtained during the training.
MIT Department
Massachusetts Institute of Technology. Department of Nuclear Science and Engineering
Terms of Use
Creative Commons Attribution
Persistent DSpace Link
DOI of Published Version
https://doi.org/10.3390/en16041603