Run 2 upgrades to the CMS Level-1 calorimeter trigger
Name
Run 2 upgrades.pdf
Size
558.28 KB
Format
Adobe PDF
Checksum (MD5)
06a039991e0b24c858a1059dceea1b62
Author(s) • • • • • • • • •
Kreis, B.
Berryhill, J.
Cavanaugh, R.
Mishra, K.
Rivera, R.
Uplegger, L.
Apanasevich, L.
Zhang, J.
Marrouche, J.
Wardle, N.
Date Issued
January 2016
Journal
Journal of Instrumentation
Publisher
IOP Publishing
Citation
Kreis, B.; Berryhill, J.; Cavanaugh, R.; Mishra, K.; Rivera, R.; Uplegger, L. and Apanasevich, L. et al. “Run 2 Upgrades to the CMS Level-1 Calorimeter Trigger.” Journal of Instrumentation 11, no. 01 (January 2016): C01051–C01051. © 2016 CERN
Version
Final published version
Abstract
The CMS Level-1 calorimeter trigger is being upgraded in two stages to maintain performance as the LHC increases pile-up and instantaneous luminosity in its second run. In the first stage, improved algorithms including event-by-event pile-up corrections are used. New algorithms for heavy ion running have also been developed. In the second stage, higher granularity inputs and a time-multiplexed approach allow for improved position and energy resolution. Data processing in both stages of the upgrade is performed with new, Xilinx Virtex-7 based AMC cards.
MIT Department
Massachusetts Institute of Technology. Department of Physics
Terms of Use
Creative Commons Attribution 3.0 Unported license
Persistent DSpace Link
DOI of Published Version
https://doi.org/10.1088/1748-0221/11/01/c01051