Repository logo
Log in(current)
Repository logoMIT Open ScholarshipDSpace@MIT
  1. Home
  2. MIT Libraries
  3. MIT Theses
  4. Graduate Theses
  5. An operational feasibility assessment for extravehicular activity in human spaceflight under communication delay using an underwater research analogue

An operational feasibility assessment for extravehicular activity in human spaceflight under communication delay using an underwater research analogue

Thumbnail Image
Download
Name

910664895-MIT.pdf

Description
Full printable version
Size

3.63 MB

Format

Adobe PDF

Checksum (MD5)

52d478a0f11b1d5f857ab8a7a2167930

Author(s)
Stanković, Aleksandra, S.M. Massachusetts Institute of Technology
Advisor(s)
Jeffrey A. Hoffman.
Date Issued
2015
Publisher
Massachusetts Institute of Technology
Abstract
As manned space exploration advances beyond low-Earth orbit, new challenges in the planning and execution of mission tasks such as extravehicular activity (EVA) will emerge. One such challenge will be the mitigation of risks associated with communication delay between Earth and remote exploration crews. This paper provides an introduction to the problem of EVA operations under Mars-like communication delay, and evaluates the feasibility of a relay-based communication protocol through a research investigation conducted at an underwater space flight analogue facility. Three underwater dive expeditions were completed to investigate the impact of communication time delay on the execution of a model geological survey EVA. To simulate communication with an exploration team on Mars or a near-Mars asteroid, a 5-minute transmission delay was instituted each way between divers and mission controllers. Performance measures tracked included task completion times, number of sampling activities completed, and incidence of task interruptions which delayed sampling activities. Findings indicate that, even under communication delay, aquanauts were able to complete a high number of the prescribed mission tasks, with only minimal interruptive events occurring. Task complexity was a major determining factor for completion duration, and the occurrence of interruptive events did not significantly increase completion times. Overall, the findings from this study support the operational feasibility of a relay-based strategy for mitigating risks related to communication delay. While further work remains to be done, this study represents an initial step in the elucidation of an important operational consideration for the success of future manned missions beyond Earth orbit.
Description
Thesis: S.M., Massachusetts Institute of Technology, Department of Aeronautics and Astronautics, 2015.
Cataloged from PDF version of thesis.
Includes bibliographical references (pages 45-52).
Subjects
Aeronautics and Astronautics.
MIT Department
Massachusetts Institute of Technology. Department of Aeronautics and Astronautics
Terms of Use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
http://dspace.mit.edu/handle/1721.1/7582
Persistent DSpace Link
http://hdl.handle.net/1721.1/97365
Repository logo
PrivacyPermissionsAccessibilityContact us
Repository logo
Notify us about copyright concerns.