Repository logo
Log in(current)
Repository logoMIT Open ScholarshipDSpace@MIT
  1. Home
  2. MIT Libraries
  3. MIT Theses
  4. Graduate Theses
  5. Restoration refocused : an evaluation of the Central Everglades Planning Project

Restoration refocused : an evaluation of the Central Everglades Planning Project

Thumbnail Image
Download
Name

959725271-MIT.pdf

Description
Full printable version
Size

12.58 MB

Format

Adobe PDF

Checksum (MD5)

948bf4b5c8bc7e6eda2dc8c24aa95fe0

Author(s)
Neary, Devon E
Advisor(s)
Lawrence Susskind.
Alternative Title
Evaluation of the CEPP
Date Issued
2016
Publisher
Massachusetts Institute of Technology
Abstract
In 2000, President Clinton signed legislation authorizing the Comprehensive Everglades Restoration Plan (CERP), a $7.8 billion, 68 project, 30-year effort to restore one of the most unique and diverse ecosystems in the world. The plan was the culmination of efforts by environmentalists to reverse a century of drainage and development driven by economic speculation in South Florida. For 16 years, CERP has struggled through lawsuits, stakeholder disagreements, implementation delays and a general lack of flexibility. The vastness of the Everglades and the complexity of surrounding agricultural and urban uses require a balancing act including scientific experimentation, large infrastructure construction and skillful management of divergent and competing stakeholders. Unfortunately, CERP was not up to the task. The Everglades ecosystem continues to decline. In 2011, with a great sense of urgency, the Army Corps of Engineers and the South Florida Water Management District reaffirmed their partnership and began planning for a new era of Everglades restoration. The Central Everglades Planning Project (CEPP) emerged in 2014. It promises a bold new approach to restoring the Everglades ecosystem while meeting the needs of the surrounding communities that depend on it. This thesis analyzes how CEPP is attempting to succeed where CERP failed to mitigate the Everglades' decline. It also seeks to determine whether CEPP will be able to cope with the new complexities of climate change, particularly sea level rise. Based on interviews with many of the key players and a close look at all the relevant planning documents, I found a deeply political, reactionary planning process aimed at restoring a seriously impaired ecosystem while trying to respond simultaneously to sharply competing claims on water and contradictory Federal and State regulations. I do think there are ways that CEPP planners could enhance ecosystem resilience. They would need to rely more heavily on nature-based infrastructure, redundancies in watershed governance structures, innovations in water conservation and a stronger emphasis on protecting drinking water supplies for South Florida.
Description
Thesis: M.C.P., Massachusetts Institute of Technology, Department of Urban Studies and Planning, 2016.
Cataloged from PDF version of thesis.
Includes bibliographical references (pages 111-116).
Subjects
Urban Studies and Planning.
MIT Department
Massachusetts Institute of Technology. Department of Urban Studies and Planning
Terms of Use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
http://dspace.mit.edu/handle/1721.1/7582
Persistent DSpace Link
http://hdl.handle.net/1721.1/105060
Repository logo
PrivacyPermissionsAccessibilityContact us
Repository logo
Notify us about copyright concerns.