Setting optimal production lot sizes and planned lead times in a job shop
Name
production-lot-sizes-stephen-graves.pdf
Size
892.08 KB
Format
Adobe PDF
Checksum (MD5)
79bac111ddb20ea387682e9870918bac
Author(s) •
Yuan, Rong
Graves, Stephen C
Date Issued
August 2015
Journal
International Journal of Production Research
Publisher
Taylor & Francis
Citation
Yuan, Rong, and Graves, Stephen C. “Setting Optimal Production Lot Sizes and Planned Lead Times in a Job Shop.” International Journal of Production Research 54, 20 (August 2015): 6105–6120 © 2015 Informa UK Limited, trading as Taylor & Francis Group
Version
Original manuscript
Abstract
In this research, we model a job shop that produces a set of discrete parts in a make-to-stock setting. The intent of the research is to develop a planning model to determine the optimal tactical policies that minimise the relevant manufacturing costs subject to workload variability and capacity limits. We consider two tactical decisions, namely the production lot size for each part and the planned lead time for each work station. We model the relevant manufacturing costs, entailing production overtime costs and inventory-related costs, as functions of these tactical decisions. We formulate a non-linear optimisation model and implement it in the Excel spreadsheet. We test the model with actual factory data from our research sponsor. The results are consistent with our intuition and demonstrate the potential value from jointly optimising over these tactical policies.
MIT Department
Massachusetts Institute of Technology. Operations Research Center