Right sizing for government review
Name
47260791-MIT.pdf
Description
Full printable version
Size
5.21 MB
Format
Adobe PDF
Checksum (MD5)
d9ea4eed04e7a41d1085cbcd932427be
Author(s)
Speirs, Andrew T. (Andrew Todd), 1975-
Advisor(s)
Henry S. Marcus.
Date Issued
1998
Publisher
Massachusetts Institute of Technology
Abstract
The U.S. Navy has changed many of its acquisition practices. One of these changes is from performing the early design work primarily in-house, to contracting private shipyards to do the design. This change has shifted the government's role in design to a predominantly review function. Therefore, the government needs to decide what level of review should be performed, and how much this will cost in the future. This research examines the Strategic Sealift acquisition program, which was one of the first programs that employed this new acquisition strategy. The costs of the design stages are identified, and the level of review is described. This research can be compared to later programs, and possibly used as a benchmark for future programs.
Description
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Ocean Engineering, 1998.
Includes bibliographical references (leaf 91).
Subjects
Ocean Engineering.
MIT Department
Massachusetts Institute of Technology. Department of Ocean Engineering
Terms of Use
M.I.T. theses are protected by
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
Persistent DSpace Link