Case studies in DSM : utilizing the Design Structure Matrix to improve New Product Introduction
Name
174978294-MIT.pdf
Description
Full printable version
Size
7.14 MB
Format
Adobe PDF
Checksum (MD5)
12284dd6ea182c6241bcbc3e4155c56d
Author(s)
Go, Julie W
Advisor(s)
Daniel E. Whitney and Sara L. Beckman.
Alternative Title
Utilizing the design structure matrix to improve New Product Introduction
Date Issued
2007
Publisher
Massachusetts Institute of Technology
Abstract
This thesis describes a project that applies the Design Structure Matrix (DSM) in support of the Manufacturing Excellence (MX) program at Cisco Systems, Inc to reduce the cycle time of new product development initiatives (NPI). Because they are inherently iterative with interdependent tasks, NPIs are difficult to manage. Two case studies applying the DSM were performed and used to study the inputs and outputs of the process as well as the dependencies between the process steps. Both case studies indicated that defining product requirements and needs upfront helped to eliminate rework later on in the process. The DSMs also showed that cycle time and standard deviation of cycle time were especially sensitive to interactions between changes in the Bill of Materials (BOM) and other tasks. In fact there was a "tipping point" where reducing the dependency between tasks could yield significant reductions in cycle time and standard deviation of cycle time. More significantly, the case studies highlighted the large number of stakeholders involved in the process and revealed the degree to which engineering and manufacturing must work together to reduce NPI cycle times.
(cont.) In fact, the name "Manufacturing Excellence Initiative in NPI" is a misnomer. New Product Introduction is not just the job of manufacturing but is highly integrated between such groups as marketing, design, and engineering. If the Mx Initiative in NPI is to fully meet its potential, all of these groups must fully realize this. In addition, there is a need for process infrastructure, data infrastructure, and close examination of incentives. This thesis thus shows that in order for Cisco's process improvement initiatives to succeed, buy-in from all relevant stakeholders must be won.
Description
Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division; in conjunction with the Leaders for Manufacturing Program at MIT, 2007.
Includes bibliographical references (p. 63).
Subjects
Sloan School of Management.
Engineering Systems Division.
Leaders for Manufacturing Program.
MIT Department
Leaders for Manufacturing Program at MIT
Massachusetts Institute of Technology. Engineering Systems Division
Sloan School of Management
Terms of Use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Persistent DSpace Link