Analyzing tradeoffs between working capital and production capacity for multi-stage manufacturing processes
Name
962735989-MIT.pdf
Description
Full printable version
Size
6.42 MB
Format
Adobe PDF
Checksum (MD5)
a11484992d23c3c8c381da70b712c903
Author(s) •
Kamareddine, Karim
Yao, Yihong
Advisor(s)
Jarrod Goentzel.
Date Issued
2016
Publisher
Massachusetts Institute of Technology
Abstract
Large pharmaceutical companies struggle to find innovative ways to reduce work-in-process inventory in their production facilities. In our research, we focus on the tradeoff between inventory and production capacity through investing in new facilities and equipment. This tradeoff will depend on the company's objectives and what it is willing to give up in return for reducing inventory. We found that increasing capacity to reduce work-in-process inventory by investing in new facilities is not always the most favorable approach in terms of net present value. However, for flexibility or lead-time improvements, it may make sense to proceed with the investment. We developed multiple scenarios considering the company's future plans to reduce inventory or grow. These scenarios provide insights into the factors that improve the attractiveness of the investments and those that do not. Our financial analysis along with the guidelines and procedures that we have developed help the sponsor company most effectively reach its goal to reduce its work in process inventory.
Description
Thesis: M. Eng. in Logistics, Massachusetts Institute of Technology, Supply Chain Management Program, 2016.
Cataloged from PDF version of thesis.
Includes bibliographical references (pages 46-47).
Subjects
Supply Chain Management Program.
Engineering Systems Division.
MIT Department
Massachusetts Institute of Technology. Supply Chain Management Program
Terms of Use
MIT theses may be protected by copyright. Please reuse MIT thesis content according to the MIT Libraries Permissions Policy, which is available through the URL provided.
Persistent DSpace Link