Phantom work : design iteration timing in new product development
Name
429532189-MIT.pdf
Description
Full printable version
Size
81.82 MB
Format
Adobe PDF
Checksum (MD5)
9fe626a25d5ac5042ca753871a3f2ed6
Author(s)
McCarthy, Daniel J. (Daniel Joseph)
Advisor(s)
Nelson Repenning.
Alternative Title
Design iteration timing in new product development
Date Issued
2008
Publisher
Massachusetts Institute of Technology
Abstract
As companies compete to gain market share, increase profits and affect growth they often turn to concurrent engineering in an effort to bring new products to the market more quickly. Despite many anecdotal success stories, implementation of concurrent engineering can often prove difficult. As the pressure to bring new products to market increases, companies often compress their design iteration cycle times in an effort to develop products more quickly. In many cases, design cycles may overlap creating situations where learning opportunities (e.g. through testing) are missed and/or ignored. More perversely, compressing design iteration cycles can cause the creation of "phantom errors" and unnecessary rework as concurrent design activities iterate at different speeds. In this research, I use a system dynamics approach to develop a stylized simulation model of the design-build-test iteration cycle to explore the effects of cycle timing on learning. Specifically, I look at the frequency and timing of integration (build) test events and their effect on new product delivery time, quality, and development cost. This research adds to the existing literature in new product development, concurrent engineering, and system dynamics. Ultimately, the results serve to inform new product development project managers of the implications of design iteration timing on project performance and assist in the scheduling of integration events.
Description
Thesis (Ph. D.)--Massachusetts Institute of Technology, Sloan School of Management, 2008.
Includes bibliographical references (p. 288-290).
Subjects
Sloan School of Management.
MIT Department
Sloan School of Management
Terms of Use
M.I.T. theses are protected by
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
Persistent DSpace Link