Overview of the SPARC physics basis towards the exploration of burning-plasma regimes in high-field, compact tokamaks
Name
Rodriguez-Fernandez_2022_Nucl._Fusion_62_042003.pdf
Description
Published version
Size
3.8 MB
Format
Adobe PDF
Checksum (MD5)
aa8299b1af8c6a2da577b50f12994810
Author(s) • • • • • • • • •
Rodriguez-Fernandez, P
Creely, AJ
Greenwald, MJ
Brunner, D
Ballinger, SB
Chrobak, CP
Garnier, DT
Granetz, R
Hartwig, ZS
Howard, NT
Date Issued
2022
Journal
Nuclear Fusion
Publisher
IOP Publishing
Citation
Rodriguez-Fernandez, P, Creely, AJ, Greenwald, MJ, Brunner, D, Ballinger, SB et al. 2022. "Overview of the SPARC physics basis towards the exploration of burning-plasma regimes in high-field, compact tokamaks." Nuclear Fusion, 62 (4).
Version
Final published version
Abstract
Abstract
The SPARC tokamak project, currently in engineering design, aims to achieve breakeven and burning plasma conditions in a compact device, thanks to new developments in high-temperature superconductor technology. With a magnetic field of 12.2 T on axis and 8.7 MA of plasma current, SPARC is predicted to produce 140 MW of fusion power with a plasma gain of Q ≈ 11, providing ample margin with respect to its mission of Q > 2. All tokamak systems are being designed to produce this landmark plasma discharge, thus enabling the study of burning plasma physics and tokamak operations in reactor relevant conditions to pave the way for the design and construction of a compact, high-field fusion power plant. Construction of SPARC is planned to begin by mid-2021.
The SPARC tokamak project, currently in engineering design, aims to achieve breakeven and burning plasma conditions in a compact device, thanks to new developments in high-temperature superconductor technology. With a magnetic field of 12.2 T on axis and 8.7 MA of plasma current, SPARC is predicted to produce 140 MW of fusion power with a plasma gain of Q ≈ 11, providing ample margin with respect to its mission of Q > 2. All tokamak systems are being designed to produce this landmark plasma discharge, thus enabling the study of burning plasma physics and tokamak operations in reactor relevant conditions to pave the way for the design and construction of a compact, high-field fusion power plant. Construction of SPARC is planned to begin by mid-2021.
MIT Department
Massachusetts Institute of Technology. Department of Nuclear Science and Engineering
Terms of Use
Creative Commons Attribution 4.0 International license
Persistent DSpace Link
DOI of Published Version
https://doi.org/10.1088/1741-4326/AC1654