Approximating weighted completion time via stronger negative correlation
Name
10951_2023_780_ReferencePDF.pdf
Size
485.68 KB
Format
Adobe PDF
Checksum (MD5)
fb1e113e2a1afb1f698515de67540b0b
Author(s) • •
Baveja, Alok
Qu, Xiaoran
Srinivasan, Aravind
Date Issued
March 30, 2023
Journal
Journal of Scheduling
Publisher
Springer US
Citation
Baveja, A., Qu, X. & Srinivasan, A. Approximating weighted completion time via stronger negative correlation. J Sched 27, 319–328 (2024).
Version
Author's final manuscript
Abstract
Minimizing the weighted completion time of jobs in the unrelated parallel machines model is a fundamental scheduling problem. The first (3/2−𝑐)
–approximation algorithm for this problem, for some constant 𝑐>0
, was obtained in the work of Bansal et al. (SIAM J Comput, 2021). A key ingredient in this work was the first dependent-rounding algorithm with a certain guaranteed amount of negative correlation. We improve upon this guaranteed amount from 1/108 to 1/27, thus also improving upon the constant c in the algorithms of Bansal et al. and Li (SIAM J Comput, 2020) for weighted completion time. Given the now-ubiquitous role played by dependent rounding in scheduling and combinatorial optimization, our improved dependent rounding is also of independent interest.
MIT Department
Massachusetts Institute of Technology. Department of Electrical Engineering and Computer Science
Terms of Use
Article is made available in accordance with the publisher's policy and may be subject to US copyright law. Please refer to the publisher's site for terms of use.
Persistent DSpace Link
DOI of Published Version
https://doi.org/10.1007/s10951-023-00780-y