Continuous Improvement Framework for a Multi-model Production Line
Name
sandifer-sandifer-mba-mgt-2023-thesis.pdf
Description
Thesis PDF
Size
4.69 MB
Format
Adobe PDF
Checksum (MD5)
472a91bec17665c918d6bf0c149395b3
Author(s)
Sandifer, Darron
Advisor(s)
Willems, Sean
Hardt, David
Date Issued
June 2023
Publisher
Massachusetts Institute of Technology
Abstract
In manufacturing, it is vital to identify current or potential bottlenecks and create plans to either eliminate, mitigate, or prevent them. There are many ways in which to assess a given system and identify the bottleneck: visual inspection, production data, anecdotal evidence, and experience, to name a few. Most strategies are a blend of methods with experience and anecdotal evidence comprising the majority of the approach which leads to large discrepancies between assessors.
This thesis details a method to standardize the assessment method of under performing portions of a manufacturing line while still giving the assessor the ability to leverage their experience, expertise, and creativity to solve the problem. This framework will be applied in a case study conducted at Nissan North America’s Canton, Mississippi Assembly Facility resulting in reclamation of approximately 50 minutes of production time eliminating the overtime requirement for a pair of manufacturing cells.
MIT Department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Sloan School of Management
Terms of Use
In Copyright - Educational Use Permitted
Copyright retained by author(s)
Persistent DSpace Link