Semi-finished modular cells
Name
50776210-MIT.pdf
Description
Full printable version
Size
7.31 MB
Format
Adobe PDF
Checksum (MD5)
9be75b5dde3d7378fc066f61e9ef5f46
Author(s)
Bachelder, Laura Govoni, 1971-
Advisor(s)
William J. Porter.
Date Issued
2002
Publisher
Massachusetts Institute of Technology
Abstract
This thesis subject is a pre-fabricated element (cell): a system that employs natural, light, and economic materials to produce a near-finished portion of a building. The intent is to introduce sustainable design into construction industry through prefabrication. The cell has been envisioned both for permanent and temporary usage: in the former case, preeminently as a construction element, while in the latter, as a finished unit. In both cases, the cell is mainly an assembly of smaller components that can possibly be recycled and reused after dismantling without additional reprocessing. The main idea behind the cell is to employ simple and small elements to achieve sustainable design.
Description
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Architecture, 2002.
Includes bibliographical references (p. 62-64).
Subjects
Architecture.
MIT Department
Massachusetts Institute of Technology. Department of Architecture
Terms of Use
M.I.T. theses are protected by
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
Persistent DSpace Link