Operations improvements through non=value-added step reduction
Name
56769502-MIT.pdf
Description
Full printable version
Size
10.57 MB
Format
Adobe PDF
Checksum (MD5)
22bbd14b98e838ccad79352c181a89d5
Author(s)
Gambell, Anthony C. (Anthony Charles), 1976-
Advisor(s)
Roy E. Welsch and David Simchi-Levi.
Date Issued
2004
Publisher
Massachusetts Institute of Technology
Abstract
This thesis demonstrates how factories can use the Value Stream Mapping method to reduce both direct and indirect labor cost components through a non-value-added step reduction. The principal objective of this internship was to identify instances of non-value-added work in a product value stream and implement actions to reduce or eliminate it. Operations improvements included actions to eliminate waste through bottleneck utilization improvements, paperwork reduction, planning tool development and safety stock level calculation. From a leadership perspective, this thesis explores the challenges of cross-cultural and second-language change management.
Description
Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Manufacturing Program at MIT, 2004.
Includes bibliographical references (p. 63-64).
Subjects
Sloan School of Management.
Mechanical Engineering.
Leaders for Manufacturing Program.
MIT Department
Leaders for Manufacturing Program at MIT
Massachusetts Institute of Technology. Department of Mechanical Engineering
Sloan School of Management
Terms of Use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Persistent DSpace Link