Development of Level-of-Service Criteria based on a Single Measure for BRT in China
Name
Development of Level-of-Service Criteria based on a Single Measur.pdf
Size
302.54 KB
Format
Adobe PDF
Checksum (MD5)
b4e0eb22bcc86febf4d98d4c39962afc
Author(s) • • •
Huo, Yueying
Zhang, Jian
Qiu, Feng
Zhao, Jinhua
Date Issued
2015
Journal
Journal of Public Transportation
Publisher
University of South Florida
Citation
Huo, Yueying; Zhao, Jinhua; Zhang, Jian and Qiu, Feng “Development of Level-of-Service Criteria Based on a Single Measure for BRT in China.” Journal of Public Transportation 18, no. 2 (June 2015): 20–33.
Version
Final published version
Abstract
Bus rapid transit (BRT) has gained popularity as a cost-effective way of expanding public transit services, and its level of service (LOS) is receiving increasing attention. However, relatively little is known about the precise criteria that can consistently and objectively classify the LOS of BRT into different levels. This paper introduces the measure of “unit delay” to develop BRT LOS criteria, defined as the sum of delays a bus experiences at stops and intersections and on a 100m link. Based on field surveys conducted on BRT in Changzhou, China, we obtained a unit delay data set and established BRT LOS criteria using Fuzzy C-means Clustering. The LOS criteria can be applied for operational, design, and planning analyses for BRT systems. A method to examine the operational conditions in spatial and temporal dimensions and pinpoint the service bottlenecks of a BRT system is presented.
MIT Department
Massachusetts Institute of Technology. Department of Civil and Environmental Engineering
Terms of Use
Creative Commons Attribution-Noncommercial
Persistent DSpace Link
DOI of Published Version
https://doi.org/10.5038/2375-0901.18.2.2