Abstract
The primary objective for the third APP CSV campaign was to perform intercontinental Very Long Baseline Interferometry (VLBI) fringe tests between phased ALMA and remote stations in Band 3, Band 6, and (conditions permitting) Band 7. Secondary objectives included preparations for making the APS available to the community for ALMA Cycle 4 and training ALMA staff in the operation of the ALMA Phasing System (APS). This is a report of those activities.
Description
This report was prepared to report on APP commissioning progress, provided as ALMA Technical Note #18.