Repository logo
Log in(current)
Repository logoMIT Open ScholarshipDSpace@MIT
  1. Home
  2. Sloan School of Management
  3. Sloan Working Papers
  4. On the n-job, one-machine, sequence-independent scheduling problem with tardiness penalties: a branch-bound solution,

On the n-job, one-machine, sequence-independent scheduling problem with tardiness penalties: a branch-bound solution,

Thumbnail Image
Download
Name

onnjobonemachine00shwi.pdf

Size

2.08 MB

Format

Adobe PDF

Checksum (MD5)

926c0b4684ef58c7df8bebc299d86101

Author(s)
Shwimer, Joel.
Date Issued
1970
Publisher
[Cambridge, Mass., M.I.T.]
Series/Report no.
Working paper (Sloan School of Management) ; 465-70.
Description
Based on the author's Master's thesis.
Subjects
Human-machine systems.
Production scheduling.
Persistent DSpace Link
http://hdl.handle.net/1721.1/48727
Repository logo
PrivacyPermissionsAccessibilityContact us
Repository logo
Notify us about copyright concerns.