Kaizen events implementation for cycle time reduction in gauge production line
Name
712599309-MIT.pdf
Description
Full printable version
Size
9.42 MB
Format
Adobe PDF
Checksum (MD5)
e9fd3626c43b467675dfeed6edb258f3
Author(s)
Liu, Ren, M. Eng. Massachusetts Institute of Technology
Advisor(s)
Kamal Youcef-Toumi.
Date Issued
2010
Publisher
Massachusetts Institute of Technology
Abstract
This thesis describes the implementation of three Kaizen events designed to improve efficiency on a gauge production line which consists of both semiconductor and mechanical equipment for manufacturing complex products with low volume and high configuration mix. A kitting process design reduced cycle time by 12 minutes in the mechanical assembly and by 3 minutes in the packing. A redesigned fixture improved loading and unloading time at the auto calibration. Use of this fixture decreased setup and dismantlement in one batch by 16 minutes. A newly designed jig made multiple loading available in batch of 8 at the vibration test, in which case, 17.5 minutes were reduced from the cycle time.
Description
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.
Cataloged from PDF version of thesis.
Includes bibliographical references (p. 62).
Subjects
Mechanical Engineering.
MIT Department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Terms of Use
M.I.T. theses are protected by
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
Persistent DSpace Link