Value Stream Mapping and Improved Cell Layout in an Oilfield Services company
Name
611152334-MIT.pdf
Description
Full printable version
Size
7.82 MB
Format
Adobe PDF
Checksum (MD5)
811c33d73c70f33d35e4c3ecb23f061f
Author(s)
Gupta, Anupam Kumar
Advisor(s)
Kamal Youcef-Toumi.
Date Issued
2009
Publisher
Massachusetts Institute of Technology
Abstract
This research explores potential improvements in efficiency through improved cell layout and value stream mapping. Analysis of cell layout led to significant reductions in material handling and operator movement along with reduction in cell area thereby improving overall productivity. Value stream mapping of protector assembly, one of the company's products, identified hidden inefficiencies in the value stream. A future state map using lean principles was also prepared. The major improvement areas concerned process improvement and lead time & Work-In-Process (WIP) reductions. This research also provides a detailed framework to deal with inventory inaccuracy existing in the system. Three inventory inaccuracy compensation methods were introduced and their performance was evaluated and compared using a simulation study.
Description
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2009.
Cataloged from PDF version of thesis.
Includes bibliographical references (p. 61).
Subjects
Mechanical Engineering.
MIT Department
Massachusetts Institute of Technology. Department of Mechanical Engineering
Terms of Use
M.I.T. theses are protected by
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
Persistent DSpace Link