Human aspects of scheduling : a case study
Name
154724887-MIT.pdf
Description
Full printable version
Size
3.37 MB
Format
Adobe PDF
Checksum (MD5)
e96591ede88054fbca47acd473ed9878
Author(s)
Boasson, Yishai, 1973-
Advisor(s)
John S. Carroll.
Date Issued
2006
Publisher
Massachusetts Institute of Technology
Abstract
This work presents a look at real-life production-floor scheduling, comparing and contrasting it to both normative OR theory and Cognitive Psychology theory. Relevant literature in OR, scheduling and psychology is reviewed, and gaps in theory are pointed out, calling for observation of real-life scheduling and for modeling of the cognitive processes underlying such activities. While normative theory and cognitive psychology theory suggest certain behaviors should be observed, a case study conducted with a large manufacturing company reveals real-life scheduling to be different from behavior expected by OR as well as by cognitive psychology. Future research is suggested, which may enable better modeling of human schedulers.
Description
Thesis (S.M.)--Massachusetts Institute of Technology, Engineering Systems Division, September 2006.
Includes bibliographical references (leaves 64-68).
Subjects
Engineering Systems Division.
MIT Department
Massachusetts Institute of Technology. Engineering Systems Division
Terms of Use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
Persistent DSpace Link