Comment on ‘Egypt’s water budget deficit and suggested mitigation policies for the Grand Ethiopian Renaissance Dam filling scenarios’
Name
Wheeler_2022_Environ._Res._Lett._17_088003.pdf
Description
Published version
Size
1.1 MB
Format
Adobe PDF
Checksum (MD5)
efd89cc1b05faceed0b728bdbc9a4080
Author(s) • • • • • • • • •
Wheeler, Kevin
Jeuland, Marc
Strzepek, Kenneth
Hall, Jim
Zagona, Edith
Abdo, Gamal
Basson, Thinus
Blackmore, Don
Block, Paul
Whittington, Dale
Date Issued
August 1, 2022
Journal
Environmental Research Letters
Publisher
IOP Publishing
Citation
Wheeler, Kevin, Jeuland, Marc, Strzepek, Kenneth, Hall, Jim, Zagona, Edith et al. 2022. "Comment on ‘Egypt’s water budget deficit and suggested mitigation policies for the Grand Ethiopian Renaissance Dam filling scenarios’." Environmental Research Letters, 17 (8).
Version
Final published version
Abstract
Abstract
In their recent paper in ERL, ‘Egypt’s water budget deficit and suggested mitigation policies for the Grand Ethiopian Renaissance Dam (GERD) filling scenarios,’ Heggy et al (2021 Environ. Res. Lett. 16 074022) paint an alarming picture of the water deficits and economic impacts for Egypt that will occur as a consequence of the filling of the GERD. Their median estimate is that filling the GERD will result in a water deficit in Egypt of ∼31 billion m3 yr−1. They estimate that under a rapid filling of the GERD over 3 yr, the Egyptian economy would lose US$51 billion and 4.74 million jobs, such that in 2024, Gross Domestic Product (GDP) per capita would be 6% lower than under a counterfactual without the GERD. These and other numbers in Heggy et al (2021 Environ. Res. Lett. 16 074022) article are inconsistent with the best scientific and economic knowledge of the Nile Basin and are not a dependable source of information for policy-makers or the general public. In this response to Heggy et al (2021 Environ. Res. Lett. 16 074022) we draw on high quality peer-reviewed literature and appropriate modeling methods to identify and analyze many flaws in their article, which include (a) not accounting for the current storage level in the High Aswan Dam reservoir (b) inappropriately using a mass-balance approach that does not account for the Nile’s hydrology or how water is managed in Egypt, Sudan and Ethiopia; (c) extreme and unfounded assumptions of reservoir seepage losses from the GERD; and (d) calculations of the economic implications for Egypt during the period of reservoir filling which are based on unfounded assumptions. In contrast to Heggy et al (2021 Environ. Res. Lett. 16 074022), robust scientific analysis has demonstrated that, whilst there is a risk of water shortages in Egypt if a severe drought were to occur at the same time as the GERD reservoir is filling, there is minimal risk of additional water shortages in Egypt during the filling period if flows in the Blue Nile are normal or above average. Moreover, the residual risks could be mitigated by effective and collaborative water management, should a drought occur.
In their recent paper in ERL, ‘Egypt’s water budget deficit and suggested mitigation policies for the Grand Ethiopian Renaissance Dam (GERD) filling scenarios,’ Heggy et al (2021 Environ. Res. Lett. 16 074022) paint an alarming picture of the water deficits and economic impacts for Egypt that will occur as a consequence of the filling of the GERD. Their median estimate is that filling the GERD will result in a water deficit in Egypt of ∼31 billion m3 yr−1. They estimate that under a rapid filling of the GERD over 3 yr, the Egyptian economy would lose US$51 billion and 4.74 million jobs, such that in 2024, Gross Domestic Product (GDP) per capita would be 6% lower than under a counterfactual without the GERD. These and other numbers in Heggy et al (2021 Environ. Res. Lett. 16 074022) article are inconsistent with the best scientific and economic knowledge of the Nile Basin and are not a dependable source of information for policy-makers or the general public. In this response to Heggy et al (2021 Environ. Res. Lett. 16 074022) we draw on high quality peer-reviewed literature and appropriate modeling methods to identify and analyze many flaws in their article, which include (a) not accounting for the current storage level in the High Aswan Dam reservoir (b) inappropriately using a mass-balance approach that does not account for the Nile’s hydrology or how water is managed in Egypt, Sudan and Ethiopia; (c) extreme and unfounded assumptions of reservoir seepage losses from the GERD; and (d) calculations of the economic implications for Egypt during the period of reservoir filling which are based on unfounded assumptions. In contrast to Heggy et al (2021 Environ. Res. Lett. 16 074022), robust scientific analysis has demonstrated that, whilst there is a risk of water shortages in Egypt if a severe drought were to occur at the same time as the GERD reservoir is filling, there is minimal risk of additional water shortages in Egypt during the filling period if flows in the Blue Nile are normal or above average. Moreover, the residual risks could be mitigated by effective and collaborative water management, should a drought occur.
MIT Department
Massachusetts Institute of Technology. Department of Earth, Atmospheric, and Planetary Sciences
Terms of Use
Creative Commons Attribution 4.0 International license
Persistent DSpace Link
DOI of Published Version
https://doi.org/10.1088/1748-9326/ac7e5e