Repository logo
Log in(current)
Repository logoMIT Open ScholarshipDSpace@MIT
  1. Home
  2. MIT Libraries
  3. MIT Theses
  4. Graduate Theses
  5. The relationship between the Massachusetts' building code and construction cost escalation

The relationship between the Massachusetts' building code and construction cost escalation

Thumbnail Image
Download
Name

1088412410-MIT.pdf

Description
Full printable version
Size

3.02 MB

Format

Adobe PDF

Checksum (MD5)

336204e9a8fff75b128ff41bc18c1e80

Author(s)
Ford, Teri (Teri Leigh)
Advisor(s)
John F. Kennedy.
Date Issued
2018
Publisher
Massachusetts Institute of Technology
Abstract
Over the last twenty years in Massachusetts, there has been significant focus on a shrinking labor supply and material cost escalation as they relate to rising construction costs. However, there are other factors attributing to increased construction costs that are often overlooked. In these twenty years, four editions of the Massachusetts building code have been released; Massachusetts is currently governed by the 9 th edition. Since the 6 th edition was released in 1997, the code has expanded to include increased seismic requirements, improved fire prevention, and the energy stretch code. However, code changes are rarely included in the industry discussion when trying to explain rising costs. According to The Greater Boston Housing Report Card from 2015, "... the cost of developing urban projects in the Commonwealth increased by nearly 40 percent more than overall inflation" (Bluestone) since 2011. This suggests there is more at play than simply a high volume of work; and while there is no disputing the cyclic nature of the real estate market and the sheer economics of supply and demand, this conversation needs to be expanded to include regulatory influence - specifically building code. The building code in Massachusetts is reviewed and amended by a qualified, volunteer board of industry professionals called the Board of Building Regulations and Standards ("BBRS"). There is a public review process for code changes and avenues for the average person to request a variance or submit suggested amendments. However, this service is severely underutilized by the commercial industry. The intent of this paper is to analyze the relationship between the development and regulatory industries through the primary filter of cost management. Through this lens, I will look at the role of code ambiguity, the layers of regulatory enforcement, and the distribution of liability and the impact on construction cost. Based on interviews with industry professionals, I have identified the primary inefficiencies in the interactions between the two industries and developed three viable solutions to address some of the criticism. These solutions address the misalignment of interests between parties, the subjective assignment of liability, and the opaque, intimidating processes surrounding code variances and appeals.
Description
Thesis: S.M. in Real Estate Development, Massachusetts Institute of Technology, Program in Real Estate Development in conjunction with the Center for Real Estate, 2018.
Cataloged from PDF version of thesis.
Includes bibliographical references (pages 44-46).
Subjects
Center for Real Estate. Program in Real Estate Development.
MIT Department
Massachusetts Institute of Technology. Center for Real Estate. Program in Real Estate Development.
Massachusetts Institute of Technology. Center for Real Estate
Terms of Use
MIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission.
http://dspace.mit.edu/handle/1721.1/7582
Persistent DSpace Link
http://hdl.handle.net/1721.1/120654
Repository logo
PrivacyPermissionsAccessibilityContact us
Repository logo
Notify us about copyright concerns.