Repository logo
Log in(current)
Repository logoMIT Open ScholarshipDSpace@MIT
  1. Home
  2. MIT Libraries
  3. MIT Theses
  4. Graduate Theses
  5. Documentation requirements for contractor pursuit of delay claims

Documentation requirements for contractor pursuit of delay claims

Thumbnail Image
Download
Name

34189363-MIT.pdf

Description
Full printable version
Size

5.77 MB

Format

Adobe PDF

Checksum (MD5)

9e56100f0338875f15fad5635431ddaa

Author(s)
Long, Darren S. (Darren Scott)
Advisor(s)
Robert D. Logcher.
Date Issued
1995
Publisher
Massachusetts Institute of Technology
Description
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1995.
Includes bibliographical references (leaves 127-135).
Subjects
Civil and Environmental Engineering
MIT Department
Massachusetts Institute of Technology. Department of Civil and Environmental Engineering
Terms of Use
M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.
http://dspace.mit.edu/handle/1721.1/7582
Persistent DSpace Link
http://hdl.handle.net/1721.1/36645
Repository logo
PrivacyPermissionsAccessibilityContact us
Repository logo
Notify us about copyright concerns.