Repository logo
Log in(current)
Repository logoMIT Open ScholarshipDSpace@MIT
  1. Home
  2. Operations Research Center
  3. Operations Research Center Working Papers
  4. A Note on Scheduling Problems with Irregular Starting Time Costs

A Note on Scheduling Problems with Irregular Starting Time Costs

Thumbnail Image
Download
Name

OR-347-00.pdf

Size

392.14 KB

Format

Adobe PDF

Checksum (MD5)

555ecdeb8425ec09479fcb4851ce7dcf

Author(s)
Schulz, Andreas S.
•
Möhring, Rolf H.
•
Stork, Frederik
•
Uetz, Marc
Date Issued
February 2000
Publisher
Massachusetts Institute of Technology, Operations Research Center
Series/Report no.
Operations Research Center Working Paper;OR 347-00
Abstract
In [9], Maniezzo and Mingozzi study a project scheduling problem with irregular starting time costs. Starting from the assumption that its computational complexity status is open, they develop a branch-and-bound procedure, and identify special cases that are solvable in polynomial time. In this note, we review three previously established, related results which show that the general problem is solvable in polynomial time.
MIT Department
Massachusetts Institute of Technology. Operations Research Center
Persistent DSpace Link
http://hdl.handle.net/1721.1/5402
Repository logo
PrivacyPermissionsAccessibilityContact us
Repository logo
Notify us about copyright concerns.