Feasibility analysis of coordinated offshore wind project development in the U.S.
Name
317870389-MIT.pdf
Description
Full printable version
Size
7.28 MB
Format
Adobe PDF
Checksum (MD5)
a96139b182ab1be8e45715c0c1a66898
Author(s)
Zhang, Mimi Q
Advisor(s)
Jonathan Raab.
Date Issued
2008
Publisher
Massachusetts Institute of Technology
Abstract
Wind energy is one of the cleanest and most available resources in the world, and advancements in wind technology are making it more cost effective. Though wind power is rapidly developing in many regions, its variable nature creates obstacles in integrating significant amounts of wind power to the electric grid. One potential solution for reducing the fluctuating nature of wind power is to site wind projects in regions of complementing wind regimes to reduce variability. This thesis explores the feasibility of creating a coordinated network of offshore wind projects through examining its technological requirements, economic viability, and the policy and planning issues of building such a network in the U.S. Wind speed data for sites along the east coast of the U.S. are used to analyze the nature of offshore wind patterns and the benefits of interconnecting multiple wind projects. The main questions are: 1) Is an offshore wind network technologically feasible? 2) What are the costs and benefits of creating an offshore network with transmission lines? 3) What are potential ways to plan, permit, and develop such a network? An overview of research on existing turbine technology, turbine foundation technology, and transmission technology show that it is technically possible to build a network of offshore wind projects. An analysis of the costs and benefits of physical interconnection show that the cost savings from reduced variability pale in comparison to interconnection costs. It is more cost effective to coordinate the siting of all projects within the network, by connect the projects directly to the onshore grid as opposed to creating a separate, offshore grid for wind projects. The current planning process for offshore wind development permits projects on a site-by-site basis, so developing an entire network of sites with the goal of reducing variability would require an extensive stakeholder process where all relevant parties agree on a set of sites. A coordinated network could also be developed over time by incorporating variability as a priority in the permitting process.
Description
Thesis (M.C.P.)--Massachusetts Institute of Technology, Dept. of Urban Studies and Planning, 2008.
Includes bibliographical references (p. 53-62).
Subjects
Urban Studies and Planning.
MIT Department
Massachusetts Institute of Technology. Department of Urban Studies and Planning
Terms of Use
M.I.T. theses are protected by
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
copyright. They may be viewed from this source for any purpose, but
reproduction or distribution in any format is prohibited without written
permission. See provided URL for inquiries about permission.
Persistent DSpace Link