CMS DAQ Current and Future Hardware Upgrades up to Post Long Shutdown 3 (LS3) Times
Name
TWEPP-17_123.pdf
Description
Published version
Size
181.9 KB
Format
Adobe PDF
Checksum (MD5)
54bd08b50e072983f62e99caa534ebce
Author(s) • • • • • • • • •
Racz, Attila
André, Jean-Marc
Behrens, Ulf
Branson, James
Chaze, Olivier
Cittolin, Sergio
Contescu, Cristian
Da Silva Gomes, Diego
Darlea, Georgiana-Lavinia
Deldicque, Christian
Date Issued
March 2018
Journal
Proceedings of Science
Publisher
Sissa Medialab
Citation
Racz, A. et al. "CMS DAQ Current and Future Hardware Upgrades up to Post Long Shutdown 3 (LS3) Times." Proceedings of Science 313 (March 2018): 123 © 2018 The Authors
Version
Final published version
Abstract
Following the first LHC collisions seen and recorded by CMS in 2009, the DAQ hardware went through a major upgrade during LS1 (2013-2014) and new detectors have been connected during 2015-2016 and 2016-2017 winter shutdowns. Now, LS2 (2019-2020) and LS3 (2024-mid 2026) are actively being prepared. This paper shows how CMS DAQ hardware has evolved from the beginning and will continue to evolve in order to meet the future challenges posed by High Luminosity LHC (HL-LHC) and the CMS detector evolution. In particular, post LS3 DAQ architectures are focused upon.
MIT Department
Massachusetts Institute of Technology. Department of Physics
Massachusetts Institute of Technology. Department of Nuclear Science and Engineering
Massachusetts Institute of Technology. Laboratory for Nuclear Science
Terms of Use
Creative Commons Attribution-NonCommercial-NoDerivs License
Persistent DSpace Link
DOI of Published Version
https://doi.org/10.22323/1.313.0123