Show simple item record

dc.contributor.advisorH. L. Bowman.en_US
dc.contributor.authorChen, Chung Wen_US
dc.date.accessioned2016-06-22T17:46:22Z
dc.date.available2016-06-22T17:46:22Z
dc.date.issued1924en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/103200
dc.descriptionThesis (B.S.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1924.en_US
dc.description.statementofresponsibilityby Chung W. Chen.en_US
dc.format.extent25, [2] leavesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectCivil and Environmental Engineeringen_US
dc.titleDesign of a 270-foot pin connected double track bridgeen_US
dc.title.alternativeDesign for a pin-connected truss, double track, through railroad bridgeen_US
dc.typeThesisen_US
dc.description.degreeB.S.en_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Civil and Environmental Engineeringen_US
dc.identifier.oclc37388557en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record