Show simple item record

dc.contributor.advisorStanley Gershwin.en_US
dc.contributor.authorIsmail, Elyuden_US
dc.contributor.otherMassachusetts Institute of Technology. Department of Mechanical Engineering.en_US
dc.date.accessioned2017-02-22T15:59:35Z
dc.date.available2017-02-22T15:59:35Z
dc.date.copyright2016en_US
dc.date.issued2016en_US
dc.identifier.urihttp://hdl.handle.net/1721.1/107027
dc.descriptionThesis: M. Eng. in Advanced Manufacturing and Design, Massachusetts Institute of Technology, Department of Mechanical Engineering, 2016.en_US
dc.descriptionThis electronic version was submitted by the student author. The certified thesis is available in the Institute Archives and Special Collections.en_US
dc.descriptionCataloged from student-submitted PDF version of thesis.en_US
dc.descriptionIncludes bibliographical references (pages 95-96).en_US
dc.description.abstractThis thesis addresses the improvement of first pass yield on the assembly floor of Varian Semiconductor Equipment and Associates (Varian) - a low volume complex semiconductor capital equipment manufacturing facility. First pass yield refers to the proportion of fully built modules that pass testing without the need for additional rework. The first pass yield (FPY) project began in 2011 and showed steady improvement for its first three years. But over the following two years, the primary yield metric has stayed level. The goal of the work presented here is to analyze the reasons for the leveling and propose novel ways of improving the metric once more. Two major quality improvement recommendations are presented in this thesis. The first is a new way of categorizing error reports that will lead to targeted corrective action to reduce the recurrence of pre-identified failure modes. A multi-step methodology is presented on how to determine an efficient corrective action, along with a case study based on data acquired from Varian. The second quality improvement recommendation involves reducing the number of part and sub-assembly shortages on the assembly floor that were shown to be correlated with poor first pass yield. A new management system for a subset of the total inventory at Varian is presented, along with a discussion on how to execute the recommendation.en_US
dc.description.statementofresponsibilityby Elyud Ismail.en_US
dc.format.extent96 pagesen_US
dc.language.isoengen_US
dc.publisherMassachusetts Institute of Technologyen_US
dc.rightsMIT theses are protected by copyright. They may be viewed, downloaded, or printed from this source but further reproduction or distribution in any format is prohibited without written permission.en_US
dc.rights.urihttp://dspace.mit.edu/handle/1721.1/7582en_US
dc.subjectMechanical Engineering.en_US
dc.titleQuality improvement at a semiconductor equipment manufacturing facility through error re-categorization and proper inventory managementen_US
dc.typeThesisen_US
dc.description.degreeM. Eng. in Advanced Manufacturing and Designen_US
dc.contributor.departmentMassachusetts Institute of Technology. Department of Mechanical Engineering
dc.identifier.oclc971200019en_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record